Production harmonizEd Reconfiguration of Flexible Robots and Machinery

Full project page
Production harmonizEd Reconfiguration of Flexible Robots  and Machinery

Lead time

General description

A lead time is the latency between the initiation and execution of a process. For example, the lead time between the placement of an order and delivery of a new car from a manufacturer (from https://en.wikipedia.org/wiki/Lead_time)


Specifics for Project PERFoRM | Production harmonizEd Reconfiguration of Flexible Robots and Machinery

 Harmonization of generic simulation and specific parametrized models into one simulation environment Result description Apart from monitoring and optimizing typical production criteria such as degree of utilization, lead times and failure safety the simulation concept will further integrate energy and resource related aspects
 System modelling, simulation and forecasting Taxon description The model represents the system itself, whereas the simulation represents the operation of the system over time.