Z-BRE4K will lead to the optimisation of the performance, avoiding waste due to malfunctioning machinery and increased energy consumption due to the presence of failures. the reduction of the electric costs is extimated by 10%.
Comment:
Z-BRE4K will lead to the optimisation of the performance, avoiding waste due to malfunctioning machinery and increased energy consumption due to the presence of failures. the reduction of the electric costs is extimated by 10%.