EPES | ECO-PROCESS ENGINEERING SYSTEM FOR COMPOSITION OF SERVICESTO OPTIMIZE PRODUCT LIFE-CYCLE
01-09-2011
-28-02-2015
01-09-2011
-28-02-2015
17-10-2011
-16-10-2014
01-10-2011
-30-09-2014
01-09-2011
-31-08-2014
01-09-2010
-28-02-2013
Simulation of manufacturing process by virtual mock-up. Verification of robot-kinematics
01-10-2011
-30-09-2014
01-10-2011
-30-09-2014
Siemens Totally Integrated Automation Portal (TIA Portal)
Siemens Totally Integrated Automation Portal (TIA Portal)
Siemens Totally Integrated Automation Portal (TIA Portal)
Siemens Totally Integrated Automation Portal (TIA Portal)
01-10-2013
-30-09-2017
Siemens Teamcenter, Process Simulate, PLCSIM Advanced, NX – The virtual commissioning system is based on Siemens’ suite of software solutions. This selection was based on the capabilities of the software itself, and on the use of Siemens hardware for the control of the demonstrator.
Siemens Teamcenter, Process Simulate, PLCSIM Advanced, NX – The virtual commissioning system is based on Siemens’ suite of software solutions. This selection was based on the capabilities of the software itself, and on the use of Siemens hardware for the control of the demonstrator.
01-11-2015
-31-10-2017
Cyper Physical Production System and digital twins requires data collection from real system
01-09-2013
-30-11-2016
Digital factory model from 3D laser scanning combined with Virtual Reality models
01-01-2015
-31-12-2017
01-09-2013
-31-08-2016
Multi objective and multidisciplinary design optimization.
Enterprise content management system