TRL6 Verification of large simulated system
Project: openMOS
Updated at: 29-04-2024
Project: openMOS
Updated at: 29-04-2024
Project: PROPHESY
Updated at: 29-04-2024
Project: MARKET4.0
Updated at: 12-01-2024
Used components:
IDS connectors for data provider, data consumer ; Clearing house ; Broker
Project: ROSSINI
Updated at: 06-12-2023
Project: ROSSINI
Updated at: 06-12-2023
Project: Daedalus
Updated at: 13-09-2023
Updated at: 18-02-2023
Project: MANUWORK
Updated at: 04-10-2022
Project: Fortissimo 2
Updated at: 03-10-2022
Project: SYMBIO-TIC
Updated at: 29-09-2022
Project: SYMBIO-TIC
Updated at: 29-09-2022
Project: BEinCPPS
Updated at: 29-09-2022
Project: BEinCPPS
Updated at: 29-09-2022
Updated at: 29-09-2022
Project: SAFIRE
Updated at: 04-06-2021
Updated at: 26-05-2021
ATS Bus - Enabled a single, common service bus for data exchange between the PLCs and other high level components of the system, including a SCADA system. Used a broker-based publish-subscribe approach to decouple the physical sources and destinations of the data to facilitate reconfigurability.
Nservicebus - The underlying technology which enabled the ATS Bus to exchange data.
OPC UA (Kepware) – Many devices could not interface directly with the service bus, so OPC UA was used to extract data and publish it to the service bus.
B2MML – Business to Manufacturing Mark-up Language. Data standard used to define the process (i.e. the set of operations to be carried out by the cell for each unique product), what resources are required for each process, the materials needed and more. The full process would be designed by engineers, and then the SCADA would break the ‘master’ B2MML process representation into sub-processes and send these to the resources via the service bus. These would then trigger the start of processes by the PLCs.
B2MML – Business to Manufacturing Mark-up Language. Data standard used to define the process (i.e. the set of operations to be carried out by the cell for each unique product), what resources are required for each process, the materials needed and more. The full process would be designed by engineers, and then the SCADA would break the ‘master’ B2MML process representation into sub-processes and send these to the resources via the service bus. These would then trigger the start of processes by the PLCs.
Project: SAFIRE
Updated at: 22-03-2021
Project: TWIN-CONTROL
Updated at: 13-02-2019
Project: TWIN-CONTROL
Updated at: 13-02-2019
Project: PROSECO
Updated at: 23-06-2018
Project: PROSECO
Updated at: 23-06-2018
Project: PROSECO
Updated at: 23-06-2018
Project: PROSECO
Updated at: 23-06-2018
Project: SYMBIO-TIC
Updated at: 22-06-2018
Project: IMPROVE
Updated at: 22-06-2018
Project: SCAIL-UP
Updated at: 22-06-2018
M4.0 metal domain addresses the BUSINESS LAYER of the vertical side of RAMI and the ENTERPRISE and CONNECTED WORLD layers of the hyerarchical side