Summary
Before MuProD solution:
- Multi-stage production system
- No transfer of manufacturing and testing methods of combustion engines possible
- State of the art: End-Of-Line inspection
- Late defect detection
- Defect cause cannot be identified
- Complex repair of final product
- Waste of resources by machining defective workpieces (time, material, …)
After MuProD solution:
1- In-line stack magnetization measurement:
- Development of a test bench for space-resolved inspection of single stacks and assembled rotors
- Integration of four numerically controlled axes
- Universal fixture for magnetic sensors
- Integrated sensor for contact free distance and eccentricity monitoring
- Analysis of superpositioning and interdependency effects of assembled rotors
- Total flux measurement of stacks and rotors using measuring coils
2- Tolerance-oriented assembly strategies:
- Compensating magnetization deviations of single stacks in the rotor assembly
- Optimal choice of stack order and rotation
3- System level optimization and verification of production logistics and quality targets:
- Correlation Analyzer
- Process-Chain Analyzer
- Defect management action classification
- System Level Defect Manager
- Modeling effect of repair strategies
More information & hyperlinks
Web resources: | http://www.muprod.eu |
Country: | GERMANY |
Address: | Feuerbach |
Geographical location(s)