Multi-robot scheduling and optimization software tools

	Multi-robot scheduling and optimization software tools
Summary
The tool Sequence Planner (SP) provides new algorithms for multi-robot scheduling and optimization, focusing on the minimization of the overall Energy Consumption. The results show a significant reduction of th Energy Consumption of individual robots and multiple robots interacting in a robot cell. Sequence Planner can be used to develop sustainable novel robotic processes and /or to manage robotic plants, achieving a strong reduction of the Energy Consumption related costs.
More information & hyperlinks
Web resources: http://www.areus-project.eu/work-packages/wp3/
Country: SWEDEN
Address: Gothenburg
Geographical location(s)
Structured mapping
Unfold all
/
Fold all
C MANUFACTURING
C10 Manufacture of food products
C16 Manufacture of wood and of products of wood and cork, except furniture; manufacture of articles of straw and plaiting materials
C21 Manufacture of basic pharmaceutical products and pharmaceutical preparations
C22 Manufacture of rubber and plastic products
C23 Manufacture of other non-metallic mineral products
C24 Manufacture of basic metals
C25 Manufacture of fabricated metal products, except machinery and equipment
C28 Manufacture of machinery and equipment n.e.c.
C29 Manufacture of motor vehicles, trailers and semi-trailers
C30 Manufacture of other transport equipment
C30.2 Manufacture of railway locomotives and rolling stock
C30.3 Manufacture of air and spacecraft and related machinery