Resources
Sustainability
Project: AIDEAS
Updated at: 12-03-2024
Formal Verification of the Control Software of a Radioactive Material Remote Handling System, Based on IEC 61499
Project: Zero-SWARM
Updated at: 12-03-2024
Heuristic Radio Access Network Subslicing with User Clustering and Bandwidth Subpartitioning
Project: 5G-TIMBER
Updated at: 12-03-2024
Inter O-DUs coordination for scheduling of massive users in O-RAN
Project: 5G-TIMBER
Updated at: 12-03-2024
Hygro-thermal modeling of timber bridge decks considering the effect of solar radiation
Project: 5G-TIMBER
Updated at: 12-03-2024
Enhanced Decision Mechanism for RAN Subslicing in Management Closed Control Loop
Project: 5G-TIMBER
Updated at: 12-03-2024
Inertial and positioning sensors fusion for indirect location tracking in warehouse inventory management
Project: 5G-TIMBER
Updated at: 12-03-2024
Adaptive Extended Kalman Filter Position Estimation Based on Ultra-Wideband Active-Passive Ranging Protocol
Project: 5G-TIMBER
Updated at: 12-03-2024
Automatic NLOS Classification from Virtual 3D City Models
Project: 5G-TIMBER
Updated at: 12-03-2024
The role of R-strategies for circular supply chains - a systematic literature review
Project: SoTecIn Factory
Updated at: 12-03-2024
Information (Switzerland)
Project: Circular TwAIn
Updated at: 12-03-2024
Open-Source Implementations of the Reactive Asset Administration Shell: A Survey
Project: Circular TwAIn
Updated at: 12-03-2024
Lecture Notes in Computer Science
Project: Circular TwAIn
Updated at: 12-03-2024
A Performance Evaluation of OWL 2 DL Reasoners using ORE 2015 and Very Large Bio Ontologies
Project: Circular TwAIn
Updated at: 12-03-2024
Periodic Reporting for period 1 - STAND4EU (Boosting the Exploitation of Standardisation Inputs from European Projects)
Project: STAND4EU
Updated at: 08-03-2024
New European Innovation Agenda
Updated at: 08-03-2024
UC 3.3: Wooden composites waste recycling
Project: 5G-TIMBER
Updated at: 05-03-2024
UC 3.2: Long term SHM of wooden constructions using IoT and embedded AI
Project: 5G-TIMBER
Updated at: 05-03-2024
UC 3.1: AR and Industry 5.0 UX assisted assembly and renovation of green buildings
Project: 5G-TIMBER
Updated at: 05-03-2024
UC 2.3: Data driven design to production cycle optimisation
Project: 5G-TIMBER
Updated at: 05-03-2024
UC 2.2: DT, AR and Industry 5.0 UX assisted production supported by ZSM 5G data exchange
Project: 5G-TIMBER
Updated at: 05-03-2024
UC 2.1: Precise localisation for production processes optimisation and human safety
Project: 5G-TIMBER
Updated at: 05-03-2024
UC 1.3: Data and AI driven industrial machines fault prediction and design support
Project: 5G-TIMBER
Updated at: 05-03-2024
UC 1.2: DTs assisted assembly, remote operation & servicing for woodworking machinery
Project: 5G-TIMBER
Updated at: 05-03-2024
UC 1.1: Data and material models driven lumber production and handling
Project: 5G-TIMBER
Updated at: 05-03-2024
Timber Helix
Project: 5G-TIMBER
Updated at: 05-03-2024