Resources

Sort by


Alesamonti DEMO

Project: IFACOM

Updated at: 22-06-2018

Show more information
Description been on isolating and deeply analysing possible sources of geometric errors (part, machine, process) and to develop tools for controlling their processes, increasing their chances to have a zero defect manufacturing

GKN DEMO

Project: IFACOM

Updated at: 22-06-2018

Show more information
Description Geometrical values of the components in stock at GKN are input to the ISP, and the program calculates all the possible configurations that can be obtained, as well as calculating the manufacturing cost

EMA DEMO

Project: IFACOM

Updated at: 22-06-2018

Show more information
Description All these things considered, the IFaCOM strategy in the EMA’s case involved: • a robust control of the industrial manufacturing of the ceramic shells of one aeronautical vane component in the production

DC Power Supply System

Project: AREUS

Updated at: 22-06-2018

Show more information
Description R-ECO delivers a novel electrical power supply for industrial robotised manufacturing production, based on DC voltage distribution and including inovative electrical equipment for power flow monitoring