QU4LITY | Digital Reality in Zero Defect Manufacturing
01-01-2019
-31-07-2022
01-01-2019
-31-07-2022
01-06-2022
-31-05-2025
01-06-2022
-31-05-2025
01-06-2022
-31-05-2025
01-01-2023
-30-06-2026
01-01-2023
-31-12-2025
01-01-2023
-31-12-2025
01-10-2022
-30-09-2026
By accelerating and upscaling the structuring process, the OPTIMAL project will increase the process efficiency and yield, which will allow for “first time right” fabrication of the required structures, lower consumption of resources, waste reduction, lower CO2 emissions, increase of productivity, and cost reduction.
01-01-2023
-31-12-2025
01-12-2022
-30-11-2025
01-01-2024
-31-12-2026
01-01-2024
-31-12-2026
01-12-2023
-31-05-2027
01-01-2024
-31-12-2026
01-10-2020
-30-09-2024
01-11-2020
-31-10-2024
01-11-2020
-31-10-2024
01-01-2021
-30-04-2024
Waste2BioComp contributes to this priority by reducing the use of fossil fuels in manufacturing (scope 1), and is developing a process for a optimal and efficient PHA production regarding energy and resource consumption. LCAs will show quantitatively this contribution.