ConnectedFactories | Industrial scenarios for connected factories
01-09-2016
-30-11-2019
01-09-2016
-30-11-2019
01-10-2017
-31-03-2021
PROGRAMS solutions will allow a more widespread adoption of predictive maintenance as a result of the demonstration of more accurate, secure and trustworthy techniques at component, machine and system level. In fact one of the biggest obstacles is getting people to change long-held maintenance practices. PROGRAMS will:
01-11-2018
-30-04-2022
The data transaction is reliable as it is based on IDS RA
01-10-2020
-30-09-2023
01-01-2020
-31-12-2023
01-10-2020
-30-09-2023
COALA's three use cases (textile, white goods, liquid production) will evaluate the COALA solution in their manufacturing processes with significant economic value.
01-01-2019
-31-07-2022
Concerning the ecological and economic operation of a factory, data analytics tools in combination with simulation approaches can contribute to improved throughput, bottleneck-reduction, or both for the production line. Through the optimization of the processes, production execution on organization and logistic level can be optimized by reducing the amount of material within the system, the lead times, or both.
Improve OEE (A) from 80% (as is) to 87% (to be)
PROGRAMS solution will allow to gain a “10% increased in-service efficiency through reduced failure rates, downtime due to repair, unplanned plant or production system outages and extension of component life.”
•reduced failure rates:All these aspects will reduce the costs related to maintenance activities, thus increasing the sustainability of the production process.