COMET | Plug-and-produce COmponents and METhods for adaptive control of industrial robots enabling cost effective, high precision manufacturing in factories of the future
01-09-2010
-28-02-2013
01-09-2010
-28-02-2013
01-11-2011
-30-04-2015
01-12-2011
-30-11-2015
01-09-2010
-31-08-2013
01-11-2012
-31-10-2015
01-01-2012
-31-12-2014
01-10-2011
-30-09-2014
01-09-2011
-31-08-2015
01-09-2010
-31-08-2013
01-11-2011
-31-10-2014
01-08-2012
-31-07-2015
01-10-2012
-29-02-2016
01-11-2012
-31-10-2015
01-06-2013
-31-05-2016
01-09-2013
-31-08-2016
01-07-2013
-31-12-2016
01-01-2015
-31-12-2017
01-12-2014
-30-11-2018
01-01-2015
-31-12-2017
01-01-2015
-30-06-2018
01-01-2015
-31-12-2017
12-01-2015
-31-05-2019
01-10-2016
-30-09-2019
01-10-2016
-31-10-2019
01-11-2017
-28-02-2021
01-01-2020
-31-12-2023
01-10-2019
-30-09-2023
01-12-2019
-30-11-2022
01-10-2022
-30-09-2026
By accelerating and upscaling the structuring process, the OPTIMAL project will increase the process efficiency and yield, which will allow for “first time right” fabrication of the required structures, lower consumption of resources, waste reduction, lower CO2 emissions, increase of productivity, and cost reduction.
01-10-2011
-30-09-2014