Synthesis report regarding the corrosion analysis
Project: JOIN-EM
Updated at: 29-04-2024
Project: JOIN-EM
Updated at: 29-04-2024
Project: SeCoIIA
Updated at: 05-02-2024
Project: QU4LITY
Updated at: 01-02-2024
Project: OPTIMAL
Updated at: 30-01-2024
Project: MARKET4.0
Updated at: 12-01-2024
Project: LIAA
Updated at: 13-12-2023
Project: ROSSINI
Updated at: 06-12-2023
Project: ROSSINI
Updated at: 06-12-2023
Project: Daedalus
Updated at: 13-09-2023
Project: JOIN-EM
Updated at: 19-07-2023
Project: SatisFactory
Updated at: 19-07-2023
Updated at: 18-02-2023
Project: MANUWORK
Updated at: 04-10-2022
Project: Fortissimo 2
Updated at: 03-10-2022
Project: SYMBIO-TIC
Updated at: 29-09-2022
Project: SYMBIO-TIC
Updated at: 29-09-2022
Project: BEinCPPS
Updated at: 29-09-2022
Project: BEinCPPS
Updated at: 29-09-2022
Updated at: 29-09-2022
Updated at: 03-02-2022
Project: SAFIRE
Updated at: 04-06-2021
Updated at: 26-05-2021
ATS Bus - Enabled a single, common service bus for data exchange between the PLCs and other high level components of the system, including a SCADA system. Used a broker-based publish-subscribe approach to decouple the physical sources and destinations of the data to facilitate reconfigurability.
Nservicebus - The underlying technology which enabled the ATS Bus to exchange data.
OPC UA (Kepware) – Many devices could not interface directly with the service bus, so OPC UA was used to extract data and publish it to the service bus.
B2MML – Business to Manufacturing Mark-up Language. Data standard used to define the process (i.e. the set of operations to be carried out by the cell for each unique product), what resources are required for each process, the materials needed and more. The full process would be designed by engineers, and then the SCADA would break the ‘master’ B2MML process representation into sub-processes and send these to the resources via the service bus. These would then trigger the start of processes by the PLCs.
B2MML – Business to Manufacturing Mark-up Language. Data standard used to define the process (i.e. the set of operations to be carried out by the cell for each unique product), what resources are required for each process, the materials needed and more. The full process would be designed by engineers, and then the SCADA would break the ‘master’ B2MML process representation into sub-processes and send these to the resources via the service bus. These would then trigger the start of processes by the PLCs.
Project: Fortissimo 2
Updated at: 22-03-2021
Project: SAFIRE
Updated at: 22-03-2021
Updated at: 19-03-2021
Updated at: 03-02-2021
Updated at: 03-02-2021
Updated at: 03-02-2021
Updated at: 03-02-2021
There was a risk that other developments made within this pilot do not follow the reference architecture of IDS and thus are incompatible. This would cause that certain applications could not be deployed and run within in the proposed data space approach.