Better Factory | Grow your manufacturing business
01-10-2020
-30-09-2024
01-10-2020
-30-09-2024
01-10-2017
-31-03-2022
01-11-2018
-30-04-2022
M4.0 reduces the required time to select the most suitable equip0ment for a manufacturing process.
M4.0 is a holistic tool valid for all type of manufacturing processes (grinding, milling, bending, cutting, additive manufacturing….)
Connecting customers and providers
In two aspects: on the one hand productivity in the selection of the equipment (faster and reliable). On the other, productivity of the equipment in place thanks to specific services that analyse the productivity on eadh manufacturing process.
The data transaction is reliable as it is based on IDS RA
Of products and services
17-12-2018
-30-06-2022
01-12-2019
-30-11-2022
01-11-2019
-30-04-2023
01-01-2020
-31-12-2023
The most relevant value-chain oriented services aim to:
01-01-2020
-31-12-2023
01-10-2019
-31-03-2024
01-10-2019
-30-09-2023
01-11-2019
-31-10-2023
01-11-2019
-31-10-2023
01-05-2019
-31-07-2022
01-04-2019
-30-09-2022
01-03-2018
-30-04-2021
01-10-2018
-31-03-2021
01-01-2019
-30-06-2023
01-01-2019
-31-12-2022
01-01-2019
-31-07-2022
Concerning the ecological and economic operation of a factory, data analytics tools in combination with simulation approaches can contribute to improved throughput, bottleneck-reduction, or both for the production line. Through the optimization of the processes, production execution on organization and logistic level can be optimized by reducing the amount of material within the system, the lead times, or both.
improve false positive rate by 20%. Measured as false positives rate, actual value is considered confidential.
Quality- Fall Off Rate, from 95% (as is) to 98,5% (to be)
Improve OEE (A) from 80% (as is) to 87% (to be)
Deviation on cycle-time, from 98% (as is) to 99% (to be)
Sintef delivered information to put “soft” part of organization also in daily management structure. Nowadays the KPI’s are hard technical related. Other topic is to use digital tools for operator- whiteboard sessions. People claim they are more digital oriented at home compared to work floor.
Stakeholder-training Logbook: No results obtained yet, as the implementation is not far enough to train stakeholders.
Improve OEE from 75% (as is) to 85% (to be)
Improve OEE (A) from 80% (as is) to 87% (to be)
Deviation on cycle-time, from 98% (as is) to 99% (to be)
Quality- Fall Off Rate, from 95% (as is) to 98,5% (to be)
01-10-2018
-31-03-2022
Expected impact: Demonstrating the potential to bring back production to Europe
Improvement of productivity in different assembly tasks:
i.Performing Car Starter Assembly
ii.Windshield visual quality check and preassembly
iii.Performing LCD TV Assembly
iv.Αircraft parts assembly
Expected impact of 15% increase in OECD Job Quality Index through work environment and safety improvement
01-12-2018
-30-11-2022
01-10-2018
-31-12-2021
Several services in the M4.0 portal permit the analisis and optimization of the equipment parameters in order to produce zero defect parts.